
Nieruchomość przemysłowa 50 km od Bratysławy 12 600m2 Yom 2008
* Total land area: 32,782 m² * Subject property land: 12,347 m²
Land Information: * Total land area: 32,782 m² * Subject property land: 12,347 m² * Other land: 7,732 m², including yard area * Common land allocated share: 12,703 m², including parking area Building Information: * Total building area: 12,636.16 m² Office: * 1st floor: 656 m², ceiling height 3 m * 2nd floor: 763 m², ceiling height 3 m * Quality / inspection room: 107 m², ceiling height 3 m Production Area: * Tool & die repair shop: 589 m², ceiling height 11 m * Press area: 5,595 m², ceiling height 11 m * Assembly line area: 3,898 m², ceiling height 11 m Warehouse: * Raw material warehouse: 549 m², ceiling height 11 m Other Area: * Locker room and break room: 479.16 m², ceiling height 3 m Floor Load Capacity: * Press area: 10 ton/m² * Tool & die shop / raw material warehouse: 5 ton/m² * Office area: 2 ton/m² Electrical Capacity: * 1,600 kVA × 2 units, 400 V For production equipment, including presses * 400 kVA × 1 unit, 400 V For doors, factory lighting, and wall outlets * 400 kVA × 1 unit, 230 V For sub-assembly equipment, automation equipment, feeders, etc. Air Compressors: * 160 kW × 2 units, installed in 2007 * 225 kW × 1 unit, installed in 2010 * 250 kW × 1 unit, installed in 2009 Water Supply: * Ø100 pipe × 2 lines * Used for offices, production, washing equipment, restrooms, etc. * Separate main cluster line: Ø225 × 1 line Drainage / Sewer: * Ø200 pipe × 4 lines * Used for offices, production, washing equipment, restrooms, etc. * Separate main cluster line: Ø400 × 1 line Cooling / Air Conditioning: * 37 air conditioners * Installed in the sub-assembly area, offices, Quality Department, etc. * 1 air handling unit (AHU) for the sub-assembly area Heating: * Heating is available throughout the entire factory, including the press area, sub-assembly area, offices, and restrooms. Available Supporting Information: * Factory layout * Factory building photos * Press line photos * Clean room and raw material area photos * Tool shop photos * Quality inspection room photos Built by Samsung Engineering This company started its business as a key supplier of a Samsung group company. So, a construction company within Samsung group built the factory. It is not shown on data, but there are some concrete floor parts outside the building in case the extention of the building is needed.